AOS On-Sky Commissioning Tests Index#
Abstract
This technote serves as an index of all the AOS On-Sky Test technotes, summarizing their status and links
Wavefront Estimation Tests#
Test Name |
Status |
Link |
---|---|---|
Optical State Measurement Verification Test (WET-001) |
Ongoing (LSSTCam, ComCam) |
|
Donut Characterization Test (WET-002) |
Pending |
Pending |
Donut Vignetting Test (WET-003) |
Pending |
Pending |
Donut Deblending Test (WET-004) |
Pending |
Pending |
Giant Donut Test (WET-005) |
Pending |
Pending |
Pairing vs. Stacking Test (WET-006) |
Pending |
Pending |
Comparison CWFS versus Other Approaches (WET-007) |
Ongoing (LSSTCam) |
|
Wavefront Estimation Chromaticity Test (WET-008) |
Pending |
Pending |
Wavefront Estimation Science Raft Interpolation Test (WET-009) |
Pending |
Pending |
Reference Wavefront Generation (WET-010) |
Pending |
Pending |
Non-common path aberrations measurements (WET-011) |
Pending |
Pending |
WEP Rejection and Robustness (WET-012) |
Pending |
Pending |
Alignment, Systematics, and Basic Control Tests,#
Test Name |
Status |
Link |
---|---|---|
Manual Alignment (ASCT-001) |
Pending |
Pending |
Focus and Centering Alignment Procedure (ASCT-002) |
Pending |
Pending |
MTAOS Incremental Alignment Procedure (ASCT-003) |
Pending |
Pending |
Measurement of the Sensitivity Matrix (ASCT-004) |
Pending |
Pending |
Sign and Coordinate System Validation (ASCT-005) |
Pending |
Pending |
PSF Independent Verification Test (ASCT-007) |
Pending |
Pending |
DoF Degeneracy Probing Test (ASCT-008) |
Pending |
Pending |
DoF Truncation / Filtering Test (ASCT-009) |
Pending |
Pending |
Look-Up Table Tests#
Test Name |
Status |
Link |
---|---|---|
Verification of Hexapods LUT using Laser Tracker (LUTT-001) |
Ongoing |
|
Verification of Hexapods LUT using the wavefront sensing capabilities (LUTT-002) |
Pending |
Pending |
Look-Up Table Elevation Residual Validation Test (LUTT-003) |
Pending |
Pending |
Look-Up Table Azimuth Dependence Test (LUTT-004) |
Pending |
Pending |
Look-Up Table Rotator Dependence Test (LUTT-005) |
Ongoing (LSSTCam, ComCam) |
|
Temperature Dependency Test (LUTT-006) |
Pending |
Pending |
Look-Up Table In-dome Turbulence Dependency Test (LUTT-007) |
Pending |
Pending |
Look-Up Table Atmospheric Contributions Test (LUTT-008) |
Pending |
Pending |
Hysteresis Verification Test (LUTT-009) |
Pending |
Pending |
Look-Up Table Residual Improvement Test (LUTT-010) |
Pending |
Pending |
Closed-Loop Tests#
Test Name |
Status |
Link |
---|---|---|
First Control Loop Performance Test (CLT-001) |
Pending |
Pending |
Control Loop Gains Test (CLT-002) |
Ongoing (LSSTCam, ComCam) |
|
Control Loop Penalty Test (CLT-003) |
Pending |
Pending |
Control Loop Kalman Filter and Error Covariances Test (CLT-004) |
Pending |
Pending |
Control Loop Performance as a function of Exposure Time (CLT-005) |
Pending |
Pending |
Control Loop Single and Double Exposure Test (CLT-006) |
Pending |
Pending |